Cebu-Cordova Link Expressway
Cebu City, Philipines
Structural typology Cable Stay Bridges
Date November, 2019
Construction CebuLink JV (Acciona Construccion S.A., First Balfour Inc. and D. M. Consunji Inc.)
FHECOR has been appointed to undertake the Independent Checking Engineering of the bridges included in the Cebu - Cordova Link Expressway in Philippines, to be built by the joint venture leaded by ACCIONA Infraestructuras.

The design will be performed by SENER and CFC, and it includes a cable stayed bridge with a main span of 390m with single towers placed in the centerline of the bridge and a concrete deck with a total width of almost 27m.

One of the main challenges for the design of the bridge is the heavy wind forces produced by the typhoons which are relatively frequent in the region together with the existence of significant seismic actions.
Pro
FHECOR has been appointed to undertake the Independent Checking Engineering of the bridges included in the Cebu - Cordova Link Expressway in Philippines, to be built by the joint venture leaded by ACCIONA Infraestructuras.

The design will be performed by SENER and CFC, and it includes a cable stayed bridge with a main span of 390m with single towers placed in the centerline of the bridge and a concrete deck with a total width of almost 27m.
One of the main challenges for the design of the bridge is the heavy wind forces produced by the typhoons which are relatively frequent in the region together with the existence of significant seismic actions.
Cebu-Cordova Link Expressway
Cebu City, Philipines
Structural typology Cable Stay Bridges
Date November, 2019
Construction CebuLink JV (Acciona Construccion S.A., First Balfour Inc. and D. M. Consunji Inc.)
Umfang Independent checking
FHECOR has been appointed to undertake the Independent Checking Engineering of the bridges included in the Cebu - Cordova Link Expressway in Philippines, to be built by the joint venture leaded by ACCIONA Infraestructuras.

The design will be performed by SENER and CFC, and it includes a cable stayed bridge with a main span of 390m with single towers placed in the centerline of the bridge and a concrete deck with a total width of almost 27m.

One of the main challenges for the design of the bridge is the heavy wind forces produced by the typhoons which are relatively frequent in the region together with the existence of significant seismic actions.