SH99 Grand Parkway - Tramos I-1B and I-2

Houston, Texas, USA

Structural typology: ROAD & HIGHWAY BRIDGES
Date: January, 2022
Owner: Texas Department of Transportation (TxDOT)
Construction: FERROVIAL
Scope: detailed design and construction support

Segments I-1B and I-2 of Grand Parkway are located to the Southeast of Houston. These segments include a total of 23 bridges with a total length of approximately 10000’. The maximum span is equal to 154’. Among these bridges is Bridge 15 with 21 spans and a total length of 2760’.

FHECOR was responsible for the detailed design of all the structures (EOR) and is serving as technical consultant to address issues arising during construction both for the structures and the layout/drainage.



Related projects