1_rs675932_fpobrasaeropuertosur26scr1024x683_fly_8624.jpg
Tenerife Sur Airport extension
Tenerife, Spain
Structural typology Airports
Date December, 2021
Construction SACYR
The new facility will connect the existing T1 and T2 with several floors, increasing the airport landside’s surface by 14,000 sqm. This intervention aims to reach a handling capacity of 16 million passengers per year.
Pro
The new facility will connect the existing T1 and T2 with several floors, increasing the airport landside’s surface by 14,000 sqm. This intervention aims to reach a handling capacity of 16 million passengers per year.
Tenerife Sur Airport extension
Tenerife, Spain
Structural typology Airports
Date December, 2021
Construction SACYR
Scope Detailed design
The new facility will connect the existing T1 and T2 with several floors, increasing the airport landside’s surface by 14,000 sqm. This intervention aims to reach a handling capacity of 16 million passengers per year.
compo_1_8625.jpg
compo_2_8626.jpg
location
Related projects