Bechem – Akumadan road reconstruction
Bechem-Akumadan, Ghana
Structural typology Roads
Date February, 2024
Owner Ministry of Roads and Highways
Construction RANGO Construction Company LTD
The Scope of Works consists in the drafting of the Preliminary Design Project and the Detailed Design Project for the reconstruction of the Bechem - Akumadan road to convert it into a paved road, including a new by-pass close to Akudaman.
The total length of the road is 40.4 km.
General features of the proposed road are as follows:
- Reference speed: 80 km/h or 60 km/h.
- Single carriageway 1 x 2 lanes. Double carriageway 2x2 lanes at the crossing of Techimantia;
- Pedestrian walkways along urbanized sections;
- Installation of horizontal and vertical signage;
- 77 hydraulic structures, including box culverts and pipes.
The following activities are included within the Scope of Works:
- Roadway (terrain model, alignment, earth works, cross sections)
- Hydrology and Drainage
- Pavement
- Signalling
- Structures
Pro
The Scope of Works consists in the drafting of the Preliminary Design Project and the Detailed Design Project for the reconstruction of the Bechem - Akumadan road to convert it into a paved road, including a new by-pass close to Akudaman.
The total length of the road is 40.4 km.
General features of the proposed road are as follows:
- Reference speed: 80 km/h or 60 km/h.
- Single carriageway 1 x 2 lanes. Double carriageway 2x2 lanes at the crossing of Techimantia;
- Pedestrian walkways along urbanized sections;
- Installation of horizontal and vertical signage;
- 77 hydraulic structures, including box culverts and pipes.
The following activities are included within the Scope of Works:
- Roadway (terrain model, alignment, earth works, cross sections)
- Hydrology and Drainage
- Pavement
- Signalling
- Structures
Bechem – Akumadan road reconstruction
Bechem-Akumadan, Ghana
Structural typology Roads
Date February, 2024
Owner Ministry of Roads and Highways
Construction RANGO Construction Company LTD
Scope Detailed design
The Scope of Works consists in the drafting of the Preliminary Design Project and the Detailed Design Project for the reconstruction of the Bechem - Akumadan road to convert it into a paved road, including a new by-pass close to Akudaman.
The total length of the road is 40.4 km.
General features of the proposed road are as follows:
- Reference speed: 80 km/h or 60 km/h.
- Single carriageway 1 x 2 lanes. Double carriageway 2x2 lanes at the crossing of Techimantia;
- Pedestrian walkways along urbanized sections;
- Installation of horizontal and vertical signage;
- 77 hydraulic structures, including box culverts and pipes.
The following activities are included within the Scope of Works:
- Roadway (terrain model, alignment, earth works, cross sections)
- Hydrology and Drainage
- Pavement
- Signalling
- Structures