web_9794.jpg
RoadT15 Dubréka-Kouria
Conakry, Guinea
Structural typology Roads
Date December, 2025
Construction QG CONSTRUCTION UK LIMITED
The scope consists of the development of the conceptual project and detailed design project for the transversal road T15 “Dubreka-Kouria” in the Republic of Guinea Conakry.
Total length of the project is 22 km, between Dubreka and Kouria.
The design includes three interchanges, the first one at Dubreka (with road N13), the second with the future expressway “the Prince Route” (currently under construction) and the third one at Kouria (with road N1).
The new road will also cross the railway track near Kouria with a flyover, allowing future railway development, up to 4 tracks.
The new road will follow the same corridor than the existing dirt road, through a very mountainous terrain.
The village of Kolakhouré will be served with additional road with single carriageway 1x2 lanes and a length of 1.7 km.
The project includes 4 steel bridges (at interchanges and railway crossing) with 37 m max. span and 169 m max. length, and 30 hydraulic structures, including box culverts and pipes.
The following activities are included within the Scope of Works:
- Roadway (terrain model, alignment, earth works, cross sections)
- Hydrology and drainage
- Pavement
- Signalling
- Structures
Pro
The scope consists of the development of the conceptual project and detailed design project for the transversal road T15 “Dubreka-Kouria” in the Republic of Guinea Conakry.
Total length of the project is 22 km, between Dubreka and Kouria.
The design includes three interchanges, the first one at Dubreka (with road N13), the second with the future expressway “the Prince Route” (currently under construction) and the third one at Kouria (with road N1).
The new road will also cross the railway track near Kouria with a flyover, allowing future railway development, up to 4 tracks.
The new road will follow the same corridor than the existing dirt road, through a very mountainous terrain.
The village of Kolakhouré will be served with additional road with single carriageway 1x2 lanes and a length of 1.7 km.
The project includes 4 steel bridges (at interchanges and railway crossing) with 37 m max. span and 169 m max. length, and 30 hydraulic structures, including box culverts and pipes.
The following activities are included within the Scope of Works:
- Roadway (terrain model, alignment, earth works, cross sections)
- Hydrology and drainage
- Pavement
- Signalling
- Structures
RoadT15 Dubréka-Kouria
Conakry, Guinea
Structural typology Roads
Date December, 2025
Construction QG CONSTRUCTION UK LIMITED
Scope Detailed design of the road, including alignment, hydrology and drainage, structures, pavement, barriers, and signage.
The scope consists of the development of the conceptual project and detailed design project for the transversal road T15 “Dubreka-Kouria” in the Republic of Guinea Conakry.
Total length of the project is 22 km, between Dubreka and Kouria.
The design includes three interchanges, the first one at Dubreka (with road N13), the second with the future expressway “the Prince Route” (currently under construction) and the third one at Kouria (with road N1).
The new road will also cross the railway track near Kouria with a flyover, allowing future railway development, up to 4 tracks.
The new road will follow the same corridor than the existing dirt road, through a very mountainous terrain.
The village of Kolakhouré will be served with additional road with single carriageway 1x2 lanes and a length of 1.7 km.
The project includes 4 steel bridges (at interchanges and railway crossing) with 37 m max. span and 169 m max. length, and 30 hydraulic structures, including box culverts and pipes.
The following activities are included within the Scope of Works:
- Roadway (terrain model, alignment, earth works, cross sections)
- Hydrology and drainage
- Pavement
- Signalling
- Structures
captura_de_pantalla_20240905_115004_9795.jpg
location