alzado_8922.jpg
Arezzo Bridge
Buriano, Italy
Typologie Road & Highway Bridges
Date Décembre, 2023
The new bridge is located around 850 m far from the existing one (built in the XII century), and it will allow crossing the Arno river safely. Furthermore, the vehicle traffic will be moved from the existing to the new bridge, allowing the future restoration and conservative rehabilitation of the historical bridge.

The bridge is part of a larger project that includes improving the road layout and connections of the entire area.
Pro
The new bridge is located around 850 m far from the existing one (built in the XII century), and it will allow crossing the Arno river safely. Furthermore, the vehicle traffic will be moved from the existing to the new bridge, allowing the future restoration and conservative rehabilitation of the historical bridge.
The bridge is part of a larger project that includes improving the road layout and connections of the entire area.
Arezzo Bridge
Buriano, Italy
Typologie Road & Highway Bridges
Date Décembre, 2023
Mission Tender design and detailed design
The new bridge is located around 850 m far from the existing one (built in the XII century), and it will allow crossing the Arno river safely. Furthermore, the vehicle traffic will be moved from the existing to the new bridge, allowing the future restoration and conservative rehabilitation of the historical bridge.

The bridge is part of a larger project that includes improving the road layout and connections of the entire area.
alzado_croquis_con_arboles_ii_8841.jpg
orilla_8842.jpg
detalle_pila_8923.jpg
avenida_200_anos_ok_8845.jpg
desde_orilla_8924.jpg
aerea_8925.jpg
emplacement
Projets en lien