|
North Tarrant Expressway: IH-30 direct connector |
|
Fort Worth, Texas, USA |
|
|
|
|
Structural typology |
Road & Highway Bridges |
Date |
December, 2022 |
Owner |
Texas Department of Transportation (TxDOT) |
Construction |
Ferrovial Agroman US Corp. |
|
|
The IH-30 direct connector allows the traffic headed east on IH-30 to connect with the IH-35 Managed Lanes headed North, crossing over the General Purpose Lanes and Luella St. It is an 18-span bridge with an S-shaped layout. The design involved the widening of an existing structure and the design of a variety of pier typologies.
FHECOR was responsible for the detailed design of the structure (EOR).