Puerta de Hierro viaducts
Madrid, España
Typologie Road & Highway Bridges
Date Juillet, 2000
Maîtrise d'ouvrage Ministerio de Fomento
Constructeur acs proyectos obras y construcciones.
The Puerta de Hierro bridge consists of two parallel viaducts, one 413.17m long and the other 265.17m, which begin on the N-VI motorway, they pass over the M-30 ring-road motorway and even over the N-VI itself. The standard span length is approximately 25.00m with a single maximum 40.0m span which crosses the N-VI motorway. The deck has a constant 1.25m depth but is deepened at the supports of the main span. The pier shafts are either rectangular or conically tapered, depending on their position.

The two viaducts were built placing the steel boxes, section by section, with the help of cranes. The upper concrete slab was built with a receiving slab on which reinforcement was placed and subsequently concrete was cast on top.
Pro
The Puerta de Hierro bridge consists of two parallel viaducts, one 413.17m long and the other 265.17m, which begin on the N-VI motorway, they pass over the M-30 ring-road motorway and even over the N-VI itself. The standard span length is approximately 25.00m with a single maximum 40.0m span which crosses the N-VI motorway. The deck has a constant 1.25m depth but is deepened at the supports of the main span. The pier shafts are either rectangular or conically tapered, depending on their position.
The two viaducts were built placing the steel boxes, section by section, with the help of cranes. The upper concrete slab was built with a receiving slab on which reinforcement was placed and subsequently concrete was cast on top.
Puerta de Hierro viaducts
Madrid, España
Typologie Road & Highway Bridges
Date Juillet, 2000
Maîtrise d'ouvrage Ministerio de Fomento
Constructeur acs proyectos obras y construcciones.
Mission Detailed design and construction support
The Puerta de Hierro bridge consists of two parallel viaducts, one 413.17m long and the other 265.17m, which begin on the N-VI motorway, they pass over the M-30 ring-road motorway and even over the N-VI itself. The standard span length is approximately 25.00m with a single maximum 40.0m span which crosses the N-VI motorway. The deck has a constant 1.25m depth but is deepened at the supports of the main span. The pier shafts are either rectangular or conically tapered, depending on their position.

The two viaducts were built placing the steel boxes, section by section, with the help of cranes. The upper concrete slab was built with a receiving slab on which reinforcement was placed and subsequently concrete was cast on top.