news
news
07.11.2023
alzado_9336.jpg
07.11.2023
THE CONSTRUCTION OF THE ALTABIX FOOTBRIDGE IN ELCHE IS APPROVED FOR 2024

The City Council of Elche includes, for the 2024 budget, the construction of the Altabix pedestrian walkway. The construction project was drafted by FHECOR together with GUIIA Consultants and approved in 2022. The works consisted of the study for the execution of a pedestrian walkway, ramps, and access stairs, together with a retaining wall and the urbanization of the surrounding area over the Alicante-Elche commuter train line in the Altabaix area in Elche (Alicante). The walkway is resolved employing a Warren-type metal lattice with a 44 m span of rectangular section, 3 m high and 5.55 m wide. It was designed to leave enough space for a possible splitting of the track and going 7 meters of height over the train route. We are very excited about the possibility of seeing another of our projects come true.

el2.jpg
el3.jpg