Dia_Hc_10362.jpg
Railway bridge over Biobio river
Concepción, Chile
Structural typology Tender Design
Date March, 2017
Scope Preliminary project
Cliente FESUR-EFE
Design Fhecor
Owner FESUR-EFE
A preliminary structural design has been carried out for alternatives using the typical solution adopted for bridges over the Biobío River (precast concrete girders), along with an additional solution based on the use of steel girders:

- Precast concrete girder bridge. A deck with two lanes and a total width of 9.30 m has been considered. A solution composed of six double-T precast girders with a depth of 2.25 m has been preliminarily dimensioned. The piers would consist of a cap beam supporting the concrete girders, two columns located under the lane axes, a rectangular pile cap, and two rows of piles. The longest possible span will be proposed, taking into account the pier spacing of the existing bridge.

- Steel girder bridge. A continuous deck with a 60.00 m span and 9.30 m width has been proposed, composed of three full-web steel girders with a depth of 3.75 m and a 0.25 m thick top slab. The spans will be hyperstatic, with the deck operating in double composite action. The pier will consist of a cap beam supporting the deck, two columns located under the lane axes, a rectangular pile cap, and two rows of three piles.
Pro
A preliminary structural design has been carried out for alternatives using the typical solution adopted for bridges over the Biobío River (precast concrete girders), along with an additional solution based on the use of steel girders:

- Precast concrete girder bridge. A deck with two lanes and a total width of 9.30 m has been considered. A solution composed of six double-T precast girders with a depth of 2.25 m has been preliminarily dimensioned. The piers would consist of a cap beam supporting the concrete girders, two columns located under the lane axes, a rectangular pile cap, and two rows of piles. The longest possible span will be proposed, taking into account the pier spacing of the existing bridge.
- Steel girder bridge. A continuous deck with a 60.00 m span and 9.30 m width has been proposed, composed of three full-web steel girders with a depth of 3.75 m and a 0.25 m thick top slab. The spans will be hyperstatic, with the deck operating in double composite action. The pier will consist of a cap beam supporting the deck, two columns located under the lane axes, a rectangular pile cap, and two rows of three piles.
Railway bridge over Biobio river
Concepción, Chile
Structural typology Tender Design
Date March, 2017
Scope Preliminary project
Cliente FESUR-EFE
Design fhecor
Owner FESUR-EFE
A preliminary structural design has been carried out for alternatives using the typical solution adopted for bridges over the Biobío River (precast concrete girders), along with an additional solution based on the use of steel girders:

- Precast concrete girder bridge. A deck with two lanes and a total width of 9.30 m has been considered. A solution composed of six double-T precast girders with a depth of 2.25 m has been preliminarily dimensioned. The piers would consist of a cap beam supporting the concrete girders, two columns located under the lane axes, a rectangular pile cap, and two rows of piles. The longest possible span will be proposed, taking into account the pier spacing of the existing bridge.

- Steel girder bridge. A continuous deck with a 60.00 m span and 9.30 m width has been proposed, composed of three full-web steel girders with a depth of 3.75 m and a 0.25 m thick top slab. The spans will be hyperstatic, with the deck operating in double composite action. The pier will consist of a cap beam supporting the deck, two columns located under the lane axes, a rectangular pile cap, and two rows of three piles.
opcion H_10368.jpg
opcion M_10369.jpg
Aerea_10363.jpg
Aerea_Hc_10364.jpg
alzado_Hc_10365.jpg
debajo_Hc_10366.jpg
Noche_movimiento_10367.jpg
location