AP-9 Ferrol viaduct
Ferrol, La Coruña, Spain
Structural typology Road & Highway Bridges
Date Dezember, 2002
Owner Ministerio de Fomento
Construction DRAGADOS S.A.
Cliente DRAGADOS S.A.
Precast concrete beams with "in situ" concrete slab.
Total length: 1.168m / main span: 45m.
Pro
Precast concrete beams with "in situ" concrete slab.
Total length: 1.168m / main span: 45m.
AP-9 Ferrol viaduct
Ferrol, La Coruña, Spain
Structural typology Road & Highway Bridges
Date Dezember, 2002
Owner Ministerio de Fomento
Construction DRAGADOS S.A.
Umfang Detailed design and construction support
Precast concrete beams with "in situ" concrete slab.
Total length: 1.168m / main span: 45m.