nuevo_formato_ficha_dossierfly_2023_9921.jpg
Bridge Route des Pêches
Porto Novo, Benin
Structural typology Road & Highway Bridges
Date June, 2022
Scope Preliminary design
Single carriageway with one lane in each direction and a ciclepath, including 5 composite steel-concrete girder, with a máximum lengh of 830 m
Pro
Single carriageway with one lane in each direction and a ciclepath, including 5 composite steel-concrete girder, with a máximum lengh of 830 m
Bridge Route des Pêches
Porto Novo, Benin
Structural typology Road & Highway Bridges
Date June, 2022
Scope Preliminary design
Single carriageway with one lane in each direction and a ciclepath, including 5 composite steel-concrete girder, with a máximum lengh of 830 m
location