Inner Ring Road |
|
Kumasi, Ghana |
|
|
|
|
Structural typology |
Road & Highway Bridges |
Date |
July, 2022 |
Scope |
Preliminary project |
Cliente |
Propav |
Design |
Fhecor |
|
|
Road engineering and Structure design (conceptual / preliminary design):
Santasi interchange, a 3-tier interchange with:
- a Roundabout on the 1st (ground) level;
- a North-South Flyover along the New Bekwai Road on the 2nd level;
- an East-West Flyover along the Ring Road on the 3rd level
Conceptual/Preliminary design includes ground level and structures definition.
Ground level definition includes a widening of the four legs of the roundabout (Western and Southern Bypasses and the New Bekwai Road, up to the landing of the above flyovers) to a 2x2-lane facility:
Ahodwo interchange, a 2-tier interchange with:
- a Roundabout on the 1st (ground) level; and
- an East-West underpass along the Ring Road
Conceptual/Preliminary design includes ground level and structures definition.
Ground level definition includes a widening of the four legs of the roundabout (Southern Bypass, Old Bekwai Road and Harper Road, up to the landing of the above underpass) to a 2x2-lane facility:
Railway & Subin overpass.
This is a 100 m length bridge over the railway and Subin river just East of the Ahodwo Interchange.
Pedestrian Footbridges.
The proposal includes a design of a typical pedestrian footbridge.
Five (5) of this footbridge will be located along the whole project.