01b_propuesta_2__chapas_5mm_cada_10cm_9657.jpg
Bridge over Castilla canal
Naveros de Pisuerga, Spain
Structural typology Road & Highway Bridges
Date March, 2023
The Castilla Channel is an outstanding civil engineering achievement of the Spanish Enlightenment period. Construction of the channel began in 1753 and the last branch was completed in 1849. As a waterway of more than 200 km (125 miles) in length, the canal was key to the industrial and economic development of the Spanish Northern Plateau region.

A Joint Venture between FHECOR Ingenieros Consultores and Jesús Castillo Oli Arquitectura has been awarded the project to rehabilitate the historical site surrounding the 13th Floodgate of the channel, located in Naveros de Pisuerga (Palencia). The project also includes the construction of a new bridge over the channel and a proposed bypass for the existing road
Pro
The Castilla Channel is an outstanding civil engineering achievement of the Spanish Enlightenment period. Construction of the channel began in 1753 and the last branch was completed in 1849. As a waterway of more than 200 km (125 miles) in length, the canal was key to the industrial and economic development of the Spanish Northern Plateau region.

A Joint Venture between FHECOR Ingenieros Consultores and Jesús Castillo Oli Arquitectura has been awarded the project to rehabilitate the historical site surrounding the 13th Floodgate of the channel, located in Naveros de Pisuerga (Palencia). The project also includes the construction of a new bridge over the channel and a proposed bypass for the existing road
Bridge over Castilla canal
Naveros de Pisuerga, Spain
Structural typology Road & Highway Bridges
Date March, 2023
Scope Route project and detailed design
The Castilla Channel is an outstanding civil engineering achievement of the Spanish Enlightenment period. Construction of the channel began in 1753 and the last branch was completed in 1849. As a waterway of more than 200 km (125 miles) in length, the canal was key to the industrial and economic development of the Spanish Northern Plateau region.

A Joint Venture between FHECOR Ingenieros Consultores and Jesús Castillo Oli Arquitectura has been awarded the project to rehabilitate the historical site surrounding the 13th Floodgate of the channel, located in Naveros de Pisuerga (Palencia). The project also includes the construction of a new bridge over the channel and a proposed bypass for the existing road
web_1_8319.jpg
02c_propuesta_2__chapas_5mm_cada_10cm_9655.jpg
03c_propuesta_2__chapas_5mm_cada_10cm_9656.jpg
location