Pression tunnels repair works. Changuinola hydroelectric plant
Bocas del Toro, Pánama
Structural typology Hydraulic Structures
Date October, 2019
The Changuinola Hydroelectric Plant, located in the Bocas del Toro province in Panama, includes a 4,1 km long pressure headrace tunnel (HRC) and a 450 m long surge Adit tunnel (SA).

FHECOR was trusted by COBRA INFRAESTRUCTURAS HIDRÁULICAS e HISPANO SUECA DE INGENIERIA consortium to carry out the structural analysis and design of the new lining. The existing horse-shoe cross-section has been optimized by rounding its corners, thus reducing the forces acting on the structure. The execution of the lining works has used formwork travelers specially devised to fit the dimensions of the tunnels as shown in the pictures.

FHECOR has also provided technical assistance services during the execution of the civil works.
Pro
The Changuinola Hydroelectric Plant, located in the Bocas del Toro province in Panama, includes a 4,1 km long pressure headrace tunnel (HRC) and a 450 m long surge Adit tunnel (SA).

FHECOR was trusted by COBRA INFRAESTRUCTURAS HIDRÁULICAS e HISPANO SUECA DE INGENIERIA consortium to carry out the structural analysis and design of the new lining. The existing horse-shoe cross-section has been optimized by rounding its corners, thus reducing the forces acting on the structure. The execution of the lining works has used formwork travelers specially devised to fit the dimensions of the tunnels as shown in the pictures.
FHECOR has also provided technical assistance services during the execution of the civil works.
Pression tunnels repair works. Changuinola hydroelectric plant
Bocas del Toro, Pánama
Structural typology Hydraulic Structures
Date October, 2019
The Changuinola Hydroelectric Plant, located in the Bocas del Toro province in Panama, includes a 4,1 km long pressure headrace tunnel (HRC) and a 450 m long surge Adit tunnel (SA).

FHECOR was trusted by COBRA INFRAESTRUCTURAS HIDRÁULICAS e HISPANO SUECA DE INGENIERIA consortium to carry out the structural analysis and design of the new lining. The existing horse-shoe cross-section has been optimized by rounding its corners, thus reducing the forces acting on the structure. The execution of the lining works has used formwork travelers specially devised to fit the dimensions of the tunnels as shown in the pictures.

FHECOR has also provided technical assistance services during the execution of the civil works.
compo_2_7869.jpg
compo_1_7874.jpg
compo_3_7873.jpg
location