|
Montreal Olympic Stadium Technical Ring Deconstruction Checking |
|
Montreal, Canada |
|
|
|
|
|
| Structural typology |
Stadiums |
| Date |
2024-2025 |
| Umfang |
ICE. Independent Checking Engineer |
| Cliente |
Coffrage&Quipage |
|
|
|
FHECOR has been commissioned by COFFRAGE&QUIPAGE to perform the ICE checking of the Deconstruction of the Technical Ring as part of the “Remplacement de la toiture du Stade olympique de Montréal” project.
The elements to be checked are the steel structure of the form traveller (in blue in the following images), the steel structure of the device that supports the ring once it is cut (in red in the images), and the connections of the form traveller structure to the stadium roof (consoles and technical ring).