1_11166.jpg
Montreal Olympic Stadium Technical Ring Deconstruction Checking
Montreal, Canada
Structural typology Stadiums
Date 2024-2025
Umfang ICE. Independent Checking Engineer
Cliente Coffrage&Quipage
FHECOR has been commissioned by COFFRAGE&QUIPAGE to perform the ICE checking of the Deconstruction of the Technical Ring as part of the “Remplacement de la toiture du Stade olympique de Montréal” project.

The elements to be checked are the steel structure of the form traveller (in blue in the following images), the steel structure of the device that supports the ring once it is cut (in red in the images), and the connections of the form traveller structure to the stadium roof (consoles and technical ring).
Pro
FHECOR has been commissioned by COFFRAGE&QUIPAGE to perform the ICE checking of the Deconstruction of the Technical Ring as part of the “Remplacement de la toiture du Stade olympique de Montréal” project.

The elements to be checked are the steel structure of the form traveller (in blue in the following images), the steel structure of the device that supports the ring once it is cut (in red in the images), and the connections of the form traveller structure to the stadium roof (consoles and technical ring).
Montreal Olympic Stadium Technical Ring Deconstruction Checking
Montreal, Canada
Structural typology Stadiums
Date Februar, 2025
Umfang ICE. Independent Checking Engineer
Cliente Coffrage&Quipage
FHECOR has been commissioned by COFFRAGE&QUIPAGE to perform the ICE checking of the Deconstruction of the Technical Ring as part of the “Remplacement de la toiture du Stade olympique de Montréal” project.

The elements to be checked are the steel structure of the form traveller (in blue in the following images), the steel structure of the device that supports the ring once it is cut (in red in the images), and the connections of the form traveller structure to the stadium roof (consoles and technical ring).
compo2_11167.jpg
compo_11168.jpg
Standort
Related projects