solopisadas_10148.jpg
AP-9 Ferrol viaduct
Ferrol, La Coruña, Spain
Typologie Road & Highway Bridges
Date Décembre, 2002
Maîtrise d'ouvrage Ministerio de Fomento
Constructeur DRAGADOS S.A.
Client DRAGADOS S.A.
Precast concrete beams with "in situ" concrete slab.
Total length: 1.168m / main span: 45m.
Pro
Precast concrete beams with "in situ" concrete slab.
Total length: 1.168m / main span: 45m.
AP-9 Ferrol viaduct
Ferrol, La Coruña, Spain
Typologie Road & Highway Bridges
Date Décembre, 2002
Maîtrise d'ouvrage Ministerio de Fomento
Constructeur DRAGADOS S.A.
Mission Detailed design and construction support
Precast concrete beams with "in situ" concrete slab.
Total length: 1.168m / main span: 45m.
aerea_10149.jpg
web_2_10150.jpg
obra_web_10151.jpg
emplacement
Projets en lien