nuevo_formato_ficha_dossierfly_2023_9921.jpg
Bridge Route des Pêches
Porto Novo, Benin
Typologie Road & Highway Bridges
Date Juin, 2022
Single carriageway with one lane in each direction and a ciclepath, including 5 composite steel-concrete girder, with a máximum lengh of 830 m
Pro
Single carriageway with one lane in each direction and a ciclepath, including 5 composite steel-concrete girder, with a máximum lengh of 830 m
Bridge Route des Pêches
Porto Novo, Benin
Typologie Road & Highway Bridges
Date Juin, 2022
Mission Preliminary design
Single carriageway with one lane in each direction and a ciclepath, including 5 composite steel-concrete girder, with a máximum lengh of 830 m
emplacement