compo_web_9728.jpg
SMS 2A Sandbukta-Moss-Såstad
Norway
Typologie Railway Bridges
Date Décembre, 2024
SMS 2A Sandbukta-Moss-Såstad project is part of the InterCity plan in the Østfold railway"s western line. The project includes a 10.3 km, twin-track line, some of which will run above ground. The new line also requires the JV to build two tunnels, each longer than 2 km (Moss Tunnel and Carlberg Tunnel), two shorter cut-and-cover sections, a tunnel portal and a new train station with 800 m-long platforms and a pedestrian bridge.

Pro
SMS 2A Sandbukta-Moss-Såstad project is part of the InterCity plan in the Østfold railway"s western line. The project includes a 10.3 km, twin-track line, some of which will run above ground. The new line also requires the JV to build two tunnels, each longer than 2 km (Moss Tunnel and Carlberg Tunnel), two shorter cut-and-cover sections, a tunnel portal and a new train station with 800 m-long platforms and a pedestrian bridge.
SMS 2A Sandbukta-Moss-Såstad
Norway
Typologie Railway Bridges
Date Décembre, 2024
SMS 2A Sandbukta-Moss-Såstad project is part of the InterCity plan in the Østfold railway"s western line. The project includes a 10.3 km, twin-track line, some of which will run above ground. The new line also requires the JV to build two tunnels, each longer than 2 km (Moss Tunnel and Carlberg Tunnel), two shorter cut-and-cover sections, a tunnel portal and a new train station with 800 m-long platforms and a pedestrian bridge.

emplacement