875MW Combined Cycle Gas Turbine power plant (CCGT)
Flemalle, Belgium
Typologie Industrial Structures
Date Décembre, 2025
Maîtrise d'ouvrage Engie - Electrabel
New Combined Cycle Gas Turbine Power Plant with a production capacity of 875 MW located in a site owned by ENGIE in the Les Awirs, in the province of Liège, in the Walloon region, Belgium. The Unit shall be a multiple shaft configuration consisting of one gas turbine (GT), one drum type with three pressure level, a heat recovery steam generator and a lateral exhaust Steam Turbine (ST)

Construction Project (including BIM model) of the main structures of the plant: water intake and discharge, boiler foundation, turbine building, gas and steam pedestals, secondary rack, and various facilities (effluent treatment plant, fire protection system...)





Pro
New Combined Cycle Gas Turbine Power Plant with a production capacity of 875 MW located in a site owned by ENGIE in the Les Awirs, in the province of Liège, in the Walloon region, Belgium. The Unit shall be a multiple shaft configuration consisting of one gas turbine (GT), one drum type with three pressure level, a heat recovery steam generator and a lateral exhaust Steam Turbine (ST)
Construction Project (including BIM model) of the main structures of the plant: water intake and discharge, boiler foundation, turbine building, gas and steam pedestals, secondary rack, and various facilities (effluent treatment plant, fire protection system...)




875MW Combined Cycle Gas Turbine power plant (CCGT)
Flemalle, Belgium
Typologie Industrial Structures
Date Décembre, 2025
Maîtrise d'ouvrage Engie - Electrabel
Mission Detailed design
New Combined Cycle Gas Turbine Power Plant with a production capacity of 875 MW located in a site owned by ENGIE in the Les Awirs, in the province of Liège, in the Walloon region, Belgium. The Unit shall be a multiple shaft configuration consisting of one gas turbine (GT), one drum type with three pressure level, a heat recovery steam generator and a lateral exhaust Steam Turbine (ST)

Construction Project (including BIM model) of the main structures of the plant: water intake and discharge, boiler foundation, turbine building, gas and steam pedestals, secondary rack, and various facilities (effluent treatment plant, fire protection system...)





web_9578.jpg