875MW Combined Cycle Gas Turbine power plant (CCGT) |
|
Flemalle, Belgium |
|
|
|
|
Structural typology |
Industrial Structures |
Date |
December, 2025 |
Owner |
Engie - Electrabel |
|
|
New Combined Cycle Gas Turbine Power Plant with a production capacity of 875 MW located in a site owned by ENGIE in the Les Awirs, in the province of Liège, in the Walloon region, Belgium. The Unit shall be a multiple shaft configuration consisting of one gas turbine (GT), one drum type with three pressure level, a heat recovery steam generator and a lateral exhaust Steam Turbine (ST)
Construction Project (including BIM model) of the main structures of the plant: water intake and discharge, boiler foundation, turbine building, gas and steam pedestals, secondary rack, and various facilities (effluent treatment plant, fire protection system...)