Expansion of 380 kV electrical substation |
|
Hooghalen, Netherlands |
|
|
|
|
Typologie |
Industrial Structures |
Date |
Octobre, 2020 |
Maîtrise d'ouvrage |
TENNET |
|
|
FHECOR developes the structural design of the following elements of the substation:
- Transformer foundation with oil collection pit made of in-situ concrete, separated from the outside by 12 m high precast concrete fire walls.
- Electrical switchgear supports of different types made of hollow structural sections, including their respective foundations.
Control house made of prefabricated concrete panels on façades and roof.