thumbnail_1_7959.jpg
Hotel Montera Street Refurbishment
Madrid, España
Architecte AHE-Arquitectos
Typologie Rehabilitation Of Buildings
Date Décembre, 2019
Maîtrise d'ouvrage Exacorp One
Constructeur CORE
Client EXACORP ONE
Montera 25-27th street commercial building dates from 1944. Approximate dimensions in plan are 40mx40m. The existing building consists of two basements, ground floor and 8 floors in general, and 11 floors in the area called tower. The main structure is reinforced concrete frames and the slabs are generally unidirectional formed by in situ reinforced concrete joists and ceramic or concrete vaults.
In the refurbishment project, changes of use are proposed: extension of the 2nd basement area, to increase the space available for facilities and parking; ground floor and first commercial; some hotel use levels, and public areas on the roof.
Pro
Montera 25-27th street commercial building dates from 1944. Approximate dimensions in plan are 40mx40m. The existing building consists of two basements, ground floor and 8 floors in general, and 11 floors in the area called tower. The main structure is reinforced concrete frames and the slabs are generally unidirectional formed by in situ reinforced concrete joists and ceramic or concrete vaults.
In the refurbishment project, changes of use are proposed: extension of the 2nd basement area, to increase the space available for facilities and parking; ground floor and first commercial; some hotel use levels, and public areas on the roof.
Hotel Montera Street Refurbishment
Madrid, España
Architecte AHE-Arquitectos
Typologie Rehabilitation Of Buildings
Date Décembre, 2019
Maîtrise d'ouvrage Exacorp One
Constructeur CORE
Mission Detailed design
Montera 25-27th street commercial building dates from 1944. Approximate dimensions in plan are 40mx40m. The existing building consists of two basements, ground floor and 8 floors in general, and 11 floors in the area called tower. The main structure is reinforced concrete frames and the slabs are generally unidirectional formed by in situ reinforced concrete joists and ceramic or concrete vaults.
In the refurbishment project, changes of use are proposed: extension of the 2nd basement area, to increase the space available for facilities and parking; ground floor and first commercial; some hotel use levels, and public areas on the roof.
compo1_7966.jpg
compo2_7967.jpg
compo3_7968.jpg
emplacement
Projets en lien