compo_7515.jpg
Panama Subway Line 2. Viaducts and Stations
Ciudad de Panamá
Date Décembre, 2015
Maîtrise d'ouvrage Metro de Panama, S.A.
typological study
total length: 21km / 16 elevated stations / viaducts optimized with 30m spans
Pro
typological study
total length: 21km / 16 elevated stations / viaducts optimized with 30m spans
Panama Subway Line 2. Viaducts and Stations
Ciudad de Panamá
Date Décembre, 2015
Maîtrise d'ouvrage Metro de Panama, S.A.
Mission Tender design
typological study
total length: 21km / 16 elevated stations / viaducts optimized with 30m spans
emplacement
Projets en lien