| Third Tagus River crossing | |
| Lisbon, Portugal | |
| Typologie | Cable Stay Bridges |
| Date | Mai, 2014 |
| Mission | Tender design |
| Client | FCC Construcción – Impregilo – Conduril |
| Design | Fhecor |
| Collaboration | FHECOR / IDEAM / ADF |
| Constructeur | FCC Construcción – Impregilo – Conduril |
| Third Tagus River crossing | |
| Lisbon, Portugal | |
| Typologie | Cable Stay Bridges |
| Date | Mai, 2014 |
| Mission | Tender design |
| Client | FCC Construcción – Impregilo – Conduril |
| Design | fhecor |
| Collaboration | FHECOR / IDEAM / ADF |
| Constructeur | FCC Construcción – Impregilo – Conduril |
| Fiche projet | Puente Tercera Travesía del Tajo_7392.pdf |