|
Dubai Metro Rail Project - Route 2020 |
|
Dubai, Emiratos Árabes Unidos |
|
|
|
|
Architect |
CH2M + Atkins + WSP |
Structural typology |
Infrastructure Projects |
Date |
Juni, 2020 |
Owner |
RTA. Dubai Roads ¬ Transport Authority |
Construction |
Expolink 2020 (Alstom / Acciona / Gülermak) |
|
|
Independent design verification (IDV) of viaducts and value engineering (VE) of the roof structures of elevated stations of Dubai Metro Route 2020
IDV services of viaducts including ISO span up to 36 m length (with launching gantry) and continuous cantilever bridges up to 72 m length made of precast dowels.
VE works of the roof steel structures of elevated stations, including the iconic Expo Station
The ‘Route 2020’ Project is a design and build contract for the 15 km extension of the Dubai metro Red Line, 11.8 km of viaduct and 3.2 km of tunnel, including 7 new stations: 5 over-ground (1 interchange, 3 elevated and the iconic EXPO station) and 2 underground. The contract amounted to AED 10.6b (USD 2.9 billion).