                                Picado Bridge I | 
                            
                            
                                 | 
                                Algar, Cádiz, España  | 
                            
                            
                                | 
                                    
                                 | 
                                 | 
                            
                            
                                 | 
                                 | 
                            
                                                            
                                    | Typologie | 
                                    Road & Highway Bridges | 
                                
                            
                                                            
                                    | Date | 
                                    Mars, 1999 | 
                                
                            
                                                            
                                
                                    | Mission | 
                                    Detailed design and construction support | 
                                
                            
                            
                                                                                        
                                    | Constructeur | 
                                    ACS | 
                                
                            
                            
                            
                                | 
                                    
                                 | 
                                 | 
                            
                        
                    
                 
                
                    The Picado Bridge has a total length of 450.0m and a total depth of 2.30 m. Its longest span has a length of 70.0m. The deck is composed of two steel girders. The upper concrete slab has been cast over pre-cast slabs placed over the girders. The piers consist of two 1.60m diameter pile-columns which vary in height between 23.0m and 35.0m. The head of the piers is composite with the steel box section being used as framework and reinforcement.
The pile-columns were placed from a barge. Once their steel heads had been put in place and the concrete cast, the steel deck structure was launched from the piers so that the pre-cast slabs, which had also been transported by barge, could be placed upon the steel girders.