f1_1229.jpg
Los Dominicos bridge over the N-I motorway
Madrid
Typologie Road & Highway Bridges
Date Janvier, 2005
Maîtrise d'ouvrage Ayuntamiento de Madrid
Constructeur DRAGADOS
Located in the North of the Community of Madrid, this bridge over the N I motorway and its service lanes allows the connection of the road nets of Las Tablas y Sanchinarro PAUs (Programmes for Building Activities) at the level of Los Dominicos School.

The structure of the deck consists of a single beam of constant depth and four spans of 25+45+45+25 m, conditioned by the available space between the inferior road ways.

The deck is 32.40 m wide in order to allow two lanes of 6.50 m, separated by a median of 1.50 m and completed with hard shoulders, on both sides, of 3.25 m each, a support of 0.50 m for the semi-rigid barrier of about 5.00 m and an exterior railing of 0.20 m.

The transversal section of the deck is composed of three steel boxes of 1.35 m depth and an upper reinforced concrete slab of 0.25 m depth. Each one of the steel boxes is made up of an inferior metal plate of 3.00 m width and two inclined lateral webs, finished off with superior cover plates where the connection with the upper slab is placed. This slab was built on pre-cast concrete lattice slabs, less than 8.50 cm thick, which covered the entire width of the deck. The design of the deck allows to double the central support for a hypothetical construction of preference lanes between the main roadways of the N I motorway.
Pro
The two extreme piers (1 and 3) are composed of three shafts of prismatic section with semicircular cutwaters of 1.00 m diameter and allow double support at their heads; they were directly founded with pile-caps. On the contrary, the central pier (2), consisting of three circular shafts of 1.20 m diameter, was founded by means of pre-cast concrete piles of 1.80 m diameter in order to minimize side-effects on the traffic during construction. The height of the extreme piers is 11.00 m and 8.25 m of the central one.
Located in the North of the Community of Madrid, this bridge over the N I motorway and its service lanes allows the connection of the road nets of Las Tablas y Sanchinarro PAUs (Programmes for Building Activities) at the level of Los Dominicos School.

The structure of the deck consists of a single beam of constant depth and four spans of 25+45+45+25 m, conditioned by the available space between the inferior road ways.

The deck is 32.40 m wide in order to allow two lanes of 6.50 m, separated by a median of 1.50 m and completed with hard shoulders, on both sides, of 3.25 m each, a support of 0.50 m for the semi-rigid barrier of about 5.00 m and an exterior railing of 0.20 m.

The transversal section of the deck is composed of three steel boxes of 1.35 m depth and an upper reinforced concrete slab of 0.25 m depth. Each one of the steel boxes is made up of an inferior metal plate of 3.00 m width and two inclined lateral webs, finished off with superior cover plates where the connection with the upper slab is placed. This slab was built on pre-cast concrete lattice slabs, less than 8.50 cm thick, which covered the entire width of the deck. The design of the deck allows to double the central support for a hypothetical construction of preference lanes between the main roadways of the N I motorway.
The two extreme piers (1 and 3) are composed of three shafts of prismatic section with semicircular cutwaters of 1.00 m diameter and allow double support at their heads; they were directly founded with pile-caps. On the contrary, the central pier (2), consisting of three circular shafts of 1.20 m diameter, was founded by means of pre-cast concrete piles of 1.80 m diameter in order to minimize side-effects on the traffic during construction. The height of the extreme piers is 11.00 m and 8.25 m of the central one.

Los Dominicos bridge over the N-I motorway
Madrid
Typologie Road & Highway Bridges
Date Janvier, 2005
Maîtrise d'ouvrage Ayuntamiento de Madrid
Constructeur DRAGADOS
Mission Detail Design and Technical Support
Located in the North of the Community of Madrid, this bridge over the N I motorway and its service lanes allows the connection of the road nets of Las Tablas y Sanchinarro PAUs (Programmes for Building Activities) at the level of Los Dominicos School.

The structure of the deck consists of a single beam of constant depth and four spans of 25+45+45+25 m, conditioned by the available space between the inferior road ways.

The deck is 32.40 m wide in order to allow two lanes of 6.50 m, separated by a median of 1.50 m and completed with hard shoulders, on both sides, of 3.25 m each, a support of 0.50 m for the semi-rigid barrier of about 5.00 m and an exterior railing of 0.20 m.

The transversal section of the deck is composed of three steel boxes of 1.35 m depth and an upper reinforced concrete slab of 0.25 m depth. Each one of the steel boxes is made up of an inferior metal plate of 3.00 m width and two inclined lateral webs, finished off with superior cover plates where the connection with the upper slab is placed. This slab was built on pre-cast concrete lattice slabs, less than 8.50 cm thick, which covered the entire width of the deck. The design of the deck allows to double the central support for a hypothetical construction of preference lanes between the main roadways of the N I motorway.

The two extreme piers (1 and 3) are composed of three shafts of prismatic section with semicircular cutwaters of 1.00 m diameter and allow double support at their heads; they were directly founded with pile-caps. On the contrary, the central pier (2), consisting of three circular shafts of 1.20 m diameter, was founded by means of pre-cast concrete piles of 1.80 m diameter in order to minimize side-effects on the traffic during construction. The height of the extreme piers is 11.00 m and 8.25 m of the central one.