f1_1229.jpg
Los Dominicos bridge over the N-I motorway
Madrid
Structural typology Road & Highway Bridges
Date Januar, 2005
Owner Ayuntamiento de Madrid
Construction DRAGADOS
Located in the North of the Community of Madrid, this bridge over the N I motorway and its service lanes allows the connection of the road nets of Las Tablas y Sanchinarro PAUs (Programmes for Building Activities) at the level of Los Dominicos School.

The structure of the deck consists of a single beam of constant depth and four spans of 25+45+45+25 m, conditioned by the available space between the inferior road ways.

The deck is 32.40 m wide in order to allow two lanes of 6.50 m, separated by a median of 1.50 m and completed with hard shoulders, on both sides, of 3.25 m each, a support of 0.50 m for the semi-rigid barrier of about 5.00 m and an exterior railing of 0.20 m.

The transversal section of the deck is composed of three steel boxes of 1.35 m depth and an upper reinforced concrete slab of 0.25 m depth. Each one of the steel boxes is made up of an inferior metal plate of 3.00 m width and two inclined lateral webs, finished off with superior cover plates where the connection with the upper slab is placed. This slab was built on pre-cast concrete lattice slabs, less than 8.50 cm thick, which covered the entire width of the deck. The design of the deck allows to double the central support for a hypothetical construction of preference lanes between the main roadways of the N I motorway.
Pro
The two extreme piers (1 and 3) are composed of three shafts of prismatic section with semicircular cutwaters of 1.00 m diameter and allow double support at their heads; they were directly founded with pile-caps. On the contrary, the central pier (2), consisting of three circular shafts of 1.20 m diameter, was founded by means of pre-cast concrete piles of 1.80 m diameter in order to minimize side-effects on the traffic during construction. The height of the extreme piers is 11.00 m and 8.25 m of the central one.
Located in the North of the Community of Madrid, this bridge over the N I motorway and its service lanes allows the connection of the road nets of Las Tablas y Sanchinarro PAUs (Programmes for Building Activities) at the level of Los Dominicos School.

The structure of the deck consists of a single beam of constant depth and four spans of 25+45+45+25 m, conditioned by the available space between the inferior road ways.

The deck is 32.40 m wide in order to allow two lanes of 6.50 m, separated by a median of 1.50 m and completed with hard shoulders, on both sides, of 3.25 m each, a support of 0.50 m for the semi-rigid barrier of about 5.00 m and an exterior railing of 0.20 m.

The transversal section of the deck is composed of three steel boxes of 1.35 m depth and an upper reinforced concrete slab of 0.25 m depth. Each one of the steel boxes is made up of an inferior metal plate of 3.00 m width and two inclined lateral webs, finished off with superior cover plates where the connection with the upper slab is placed. This slab was built on pre-cast concrete lattice slabs, less than 8.50 cm thick, which covered the entire width of the deck. The design of the deck allows to double the central support for a hypothetical construction of preference lanes between the main roadways of the N I motorway.
The two extreme piers (1 and 3) are composed of three shafts of prismatic section with semicircular cutwaters of 1.00 m diameter and allow double support at their heads; they were directly founded with pile-caps. On the contrary, the central pier (2), consisting of three circular shafts of 1.20 m diameter, was founded by means of pre-cast concrete piles of 1.80 m diameter in order to minimize side-effects on the traffic during construction. The height of the extreme piers is 11.00 m and 8.25 m of the central one.

Los Dominicos bridge over the N-I motorway
Madrid
Structural typology Road & Highway Bridges
Date Januar, 2005
Owner Ayuntamiento de Madrid
Construction DRAGADOS
Umfang Detail Design and Technical Support
Located in the North of the Community of Madrid, this bridge over the N I motorway and its service lanes allows the connection of the road nets of Las Tablas y Sanchinarro PAUs (Programmes for Building Activities) at the level of Los Dominicos School.

The structure of the deck consists of a single beam of constant depth and four spans of 25+45+45+25 m, conditioned by the available space between the inferior road ways.

The deck is 32.40 m wide in order to allow two lanes of 6.50 m, separated by a median of 1.50 m and completed with hard shoulders, on both sides, of 3.25 m each, a support of 0.50 m for the semi-rigid barrier of about 5.00 m and an exterior railing of 0.20 m.

The transversal section of the deck is composed of three steel boxes of 1.35 m depth and an upper reinforced concrete slab of 0.25 m depth. Each one of the steel boxes is made up of an inferior metal plate of 3.00 m width and two inclined lateral webs, finished off with superior cover plates where the connection with the upper slab is placed. This slab was built on pre-cast concrete lattice slabs, less than 8.50 cm thick, which covered the entire width of the deck. The design of the deck allows to double the central support for a hypothetical construction of preference lanes between the main roadways of the N I motorway.

The two extreme piers (1 and 3) are composed of three shafts of prismatic section with semicircular cutwaters of 1.00 m diameter and allow double support at their heads; they were directly founded with pile-caps. On the contrary, the central pier (2), consisting of three circular shafts of 1.20 m diameter, was founded by means of pre-cast concrete piles of 1.80 m diameter in order to minimize side-effects on the traffic during construction. The height of the extreme piers is 11.00 m and 8.25 m of the central one.


f2_1230.jpg