Bridge over the Alberche River
El Tiemblo, Avila, España
Typologie Road & Highway Bridges
Date Juillet, 1999
Maîtrise d'ouvrage ministerio de fomento
Constructeur ute construcciones sobrino y tapusa
It is a viaduct with a composite two-beam deck of 38,00 m, 56,00 m, 66,00 m, 52,00 m and 34,00 m spans. Its reinforced concrete piers are very slender and of variable height from 22,00 m to 45,00 m. Their exterior box section is 4,00 m x 1,80 m² and their walls are 0,30 m thick Every pier has a different composite head owing to the shape of the deck. In order to control longitudinal slenderness, the deck is fixed to the abutments by means of a special system that allows movements caused by temperature and shrinkage and, at the same time, fixes the deck in case of quick movements due to violent braking.

Its piers have been built with sliding framework. Its steel pier heads were placed with a crane and cast with a concrete pump. The beams of the steel structure were also placed with a crane. The concrete of the upper slab was cast over prefabricated slabs
Pro
It is a viaduct with a composite two-beam deck of 38,00 m, 56,00 m, 66,00 m, 52,00 m and 34,00 m spans. Its reinforced concrete piers are very slender and of variable height from 22,00 m to 45,00 m. Their exterior box section is 4,00 m x 1,80 m² and their walls are 0,30 m thick Every pier has a different composite head owing to the shape of the deck. In order to control longitudinal slenderness, the deck is fixed to the abutments by means of a special system that allows movements caused by temperature and shrinkage and, at the same time, fixes the deck in case of quick movements due to violent braking.
Its piers have been built with sliding framework. Its steel pier heads were placed with a crane and cast with a concrete pump. The beams of the steel structure were also placed with a crane. The concrete of the upper slab was cast over prefabricated slabs
Bridge over the Alberche River
El Tiemblo, Avila, España
Typologie Road & Highway Bridges
Date Juillet, 1999
Maîtrise d'ouvrage ministerio de fomento
Constructeur ute construcciones sobrino y tapusa
Mission Detailed design and construction support
It is a viaduct with a composite two-beam deck of 38,00 m, 56,00 m, 66,00 m, 52,00 m and 34,00 m spans. Its reinforced concrete piers are very slender and of variable height from 22,00 m to 45,00 m. Their exterior box section is 4,00 m x 1,80 m² and their walls are 0,30 m thick Every pier has a different composite head owing to the shape of the deck. In order to control longitudinal slenderness, the deck is fixed to the abutments by means of a special system that allows movements caused by temperature and shrinkage and, at the same time, fixes the deck in case of quick movements due to violent braking.

Its piers have been built with sliding framework. Its steel pier heads were placed with a crane and cast with a concrete pump. The beams of the steel structure were also placed with a crane. The concrete of the upper slab was cast over prefabricated slabs
compo_1_7881.jpg
compo_3_7882.jpg
compo_2_7883.jpg
emplacement
Projets en lien