alejandro_abel_1_7700.jpg
Bridge over "El Burguillo" reservoir
El Tiemblo, Ávila, España
Structural typology Arch Bridges
Date Juli, 1999
Construction ute construcciones sobrino y tapusa
The Bridge over the El Burguillo Reservoir comprises a reinforced concrete arch 165.00m in span with a reinforced concrete upper deck 287.00m in total length. The solid arch is a constant 4.00m in width and has a variable depth running from 3.10 m at the abutments to 1.75 m at the crown. The deck comprises a solid slender 0.90 m deep section which consists of a 4.00m wide central core, coinciding with the width of the arch, and two large variable depth cantilevers each 4.00m in width.

The deck is rigidly supported on the piers of the approach viaducts and on the piers upon the arch which are spaced 13.75 m apart. The piers are a constant 4.00m wide, as the arch, and their depth varies with height from 0.90m to 0.35 m at the lowest piers. The arch is embedded in the deck construction.

A cantilever construction with provisional stays was used to build the arch. A launching beam system was used to build the deck.
Pro
© Alejandro Abel Núñez
The Bridge over the El Burguillo Reservoir comprises a reinforced concrete arch 165.00m in span with a reinforced concrete upper deck 287.00m in total length. The solid arch is a constant 4.00m in width and has a variable depth running from 3.10 m at the abutments to 1.75 m at the crown. The deck comprises a solid slender 0.90 m deep section which consists of a 4.00m wide central core, coinciding with the width of the arch, and two large variable depth cantilevers each 4.00m in width.
The deck is rigidly supported on the piers of the approach viaducts and on the piers upon the arch which are spaced 13.75 m apart. The piers are a constant 4.00m wide, as the arch, and their depth varies with height from 0.90m to 0.35 m at the lowest piers. The arch is embedded in the deck construction.

A cantilever construction with provisional stays was used to build the arch. A launching beam system was used to build the deck.
© Alejandro Abel Núñez
Bridge over "El Burguillo" reservoir
El Tiemblo, Ávila, España
Structural typology Arch Bridges
Date Juli, 1999
Construction ute construcciones sobrino y tapusa
Umfang Detailed design and construction support
The Bridge over the El Burguillo Reservoir comprises a reinforced concrete arch 165.00m in span with a reinforced concrete upper deck 287.00m in total length. The solid arch is a constant 4.00m in width and has a variable depth running from 3.10 m at the abutments to 1.75 m at the crown. The deck comprises a solid slender 0.90 m deep section which consists of a 4.00m wide central core, coinciding with the width of the arch, and two large variable depth cantilevers each 4.00m in width.

The deck is rigidly supported on the piers of the approach viaducts and on the piers upon the arch which are spaced 13.75 m apart. The piers are a constant 4.00m wide, as the arch, and their depth varies with height from 0.90m to 0.35 m at the lowest piers. The arch is embedded in the deck construction.

A cantilever construction with provisional stays was used to build the arch. A launching beam system was used to build the deck.
© Alejandro Abel Núñez
dibujo_7113.jpg
alejandro_abel_2_7699.jpg © Alejandro Abel Núñez
mae_3_fly_7698.jpg © Miguel Ángel Escalona
mag_2_fly_7697.jpg © Miguel Ángel Escalona
mag4_fly_7696.jpg © Miguel Ángel Escalona
compo_7695.jpg
Standort
Related projects