|  | Repair works on the railway bridge in Cala de Aguadulce | 
                            
                                |  | Sitges, España | 
                            
                                |  |  | 
                            
                                |  |  | 
                                                            
                                    | Typologie | Rehabilitation Of Bridges | 
                            
                                                            
                                    | Date | Juillet, 2012 | 
                            
                                                            
                                
                                    | Mission | Widening and structural regeneration | 
                            
                                                            
                                    | Client | ADIF | 
                            
                                                        
                            
                            
                                |  |  | 
                        
                    
                 
                
                    The Works fulfilled can be broken down into three clearly different operations. The first consists of the construction of a service way which is built on the side of the bridge in cantilever. The second is the general operations of cleaning and structural rehabilitation, consisting in high-pressure cleaning of the face and 
recomposition and re-pointing of the masonrywork. Thirdly and finally, the protection of the foundations and one of the abutments by placement of a perimeter trench filled with reinforced concrete, employing galvanized steel bars.