Repair works on the railway bridge in Cala de Aguadulce
Sitges, España
Structural typology Rehabilitation Of Bridges
Date Juli, 2012
The Works fulfilled can be broken down into three clearly different operations. The first consists of the construction of a service way which is built on the side of the bridge in cantilever. The second is the general operations of cleaning and structural rehabilitation, consisting in high-pressure cleaning of the face and
recomposition and re-pointing of the masonrywork. Thirdly and finally, the protection of the foundations and one of the abutments by placement of a perimeter trench filled with reinforced concrete, employing galvanized steel bars.
Pro
The Works fulfilled can be broken down into three clearly different operations. The first consists of the construction of a service way which is built on the side of the bridge in cantilever. The second is the general operations of cleaning and structural rehabilitation, consisting in high-pressure cleaning of the face and
ecomposition and re-pointing of the masonrywork. Thirdly and finally, the protection of the foundations and one of the abutments by placement of a perimeter trench filled with reinforced concrete, employing galvanized steel bars.
Repair works on the railway bridge in Cala de Aguadulce
Sitges, España
Structural typology Rehabilitation Of Bridges
Date Juli, 2012
Umfang Widening and structural regeneration
The Works fulfilled can be broken down into three clearly different operations. The first consists of the construction of a service way which is built on the side of the bridge in cantilever. The second is the general operations of cleaning and structural rehabilitation, consisting in high-pressure cleaning of the face and
recomposition and re-pointing of the masonrywork. Thirdly and finally, the protection of the foundations and one of the abutments by placement of a perimeter trench filled with reinforced concrete, employing galvanized steel bars.
compo2_7197.jpg
Standort