ADVANCE OF THE WORKS FOR THE I35-W/I30 INTERCHANGE, FORTH WORTH, TEXAS

02/2018

FHECOR North America has developed the detailed design for the New I30DC and is currently providing technical assessment to North Tarrant Express Infrastructure in Forth Worth, Texas

The new structure will connect the NTE TEXpress from the I-30 crossing over the Luella Street Bridge. It is divided into two different bridges, known as BR 290.1 & BR 290.2 with a total overall length of 1796 ft. The deck is 28 feet wide and will allocate one traffic lane. It is formed by Tx54 Pretensioned Concrete I-Girders supporting 8 inches cast-in-place concrete slab.

Once complete, the new connector will fully connect Interstate 30 with NTE TEXpress that will completely modernize the infrastructure and improve capacity, safety, and mobility throughout the entire corridor.

See more info at:
www.northtarrantexpress.com